Building Permits

Building Permits/Inspections – are required for new construction, reconstruction, repairing, moving a structure, roofing, windows, swimming pools, this would include but not limited to dwellings, sheds, decks garages, porches, etc. In-ground or above ground swimming pools require a permit when they are 18” or more in depth and /or have a 2,500+ gallon capacity. Inspections are required for, but not limited to, electrical work, reconstruction, chimneys, roofing, etc.

Building Permits and Inspection Forms can be obtained from the Village Hall or downloaded at this link.

Approval of Building Permits takes 3-5 business days. All building projects must comply with the setback regulations.